施工用英語口語怎么說

字號:

練習(xí)聽力,首先我們要掌握的是正確的讀音,現(xiàn)在很多老師明顯帶有地方口音,首先我們只有學(xué)好音標(biāo)、讀音,才能在聽力的時(shí)候聽得懂。以下是為您整理的施工用英語口語怎么說的相關(guān)內(nèi)容。
    
    【篇一】施工用英語口語怎么說
    施工
    [shīgōng]
    construction
    詳細(xì)釋義
    源自:《外教社·柯林斯?jié)h英大詞典》Collins外教社
    to construct
    施工計(jì)劃
    construction plan
    橋梁施工隊(duì)
    bridge construction team
    全年施工
    under construction all year
    我國自行設(shè)計(jì),自行施工建設(shè)的南京長江大橋
    the Yangtze bridge at Nanjing, designed and built in China
    新校舍竣工的期限快到了,工人們正抓緊施工。
    The deadline for the completion of the new school building is approaching, and the workers are pressing ahead with the construction.
    這樣的施工方法實(shí)屬國內(nèi)首創(chuàng)。
    Such a construction method is the first in China.
    建筑工人在炎炎烈日下施工,真夠辛苦的。
    Construction workers are very hard to work under the scorching sun.
    【篇二】施工用英語口語怎么說
    這項(xiàng)工程在施工時(shí)偷工減料,致使工程質(zhì)量低劣,給人民的生命財(cái)產(chǎn)安全造成了嚴(yán)重?fù)p害。
    During the construction of this project, jerry-building and cutting materials resulted in poor quality of the project and serious damage to the safety of people's lives and property.
    部長來水利工地考察施工情況。
    The minister inspects the construction site of the water conservancy site.
    鋪路工人在灼熱的太陽光下施工,累得滿頭大汗。
    Paving workers were sweating heavily under the scorching sun.
    李叔叔的工程隊(duì)在施工過程中偷工減料,導(dǎo)致工程質(zhì)量不合格。
    Uncle Li's engineering team cut corners during the construction process, resulting in unqualified engineering quality.
    施工完畢后,將由上級部門前來驗(yàn)收。
    After completion of construction, the higher authorities will come to check and accept.
    【篇三】施工用英語口語怎么說
    在施工之前,工人叔叔需要勘察一下地形。
    Before construction, uncle workers need to survey the terrain.
    我們的校舍,由設(shè)計(jì)院繪制藍(lán)圖,建筑公司負(fù)責(zé)施工。
    Our school buildings are drawn up by the Design Institute, and the construction company is responsible for the construction.
    前幾天城管科就派施工隊(duì)逐家逐戶敲門拆除,不勝其煩。
    A few days ago, the urban management section sent the construction team to knock down the door one by one from door to door.
    莫非施工的時(shí)候,他竟沒有想到,用這樣的建筑材料,大樓終究是要垮的么?
    Could he not have thought that building materials would collapse after such construction?
    施工方在采購或施工過程中有敷衍行為,那絕對是“豆腐渣”工程。
    The constructor has perfunctory behavior in the process of procurement or construction, which is definitely "tofu dregs" project.