外貿(mào)英語話題王第6期:談判結(jié)語

字號:

he conclusion of negotiation
    談判結(jié)語
    A:So,now we have covered all the importantpoints.
    A:現(xiàn)在,所有的主要問題我們都已討論過了
    B:Yes.I think so.
    B:我想是的
    A:Before we draft the contract.let'sexamine the details.
    A:在起草之前,我們先檢查一下所有的細(xì)節(jié)
    B:Ok.under this contract.we’ll supply youwith 600 dozen T-shirts.S,M and L equally assorted. at USD 100 per dozen.CFRLondon. Shipment in July. Payment by irrevocable sight UC.
    B:好的、根據(jù)這項(xiàng)合同,我們將向貴方出售600 打T恤衫,大、中、小號平均搭配,每打100美元,成本加運(yùn)費(fèi)倫敦價7月裝運(yùn),以不可撤銷的即期信用證付款。
    A:Perfect. But what I’m concerned aboutmost is the time of delive。
    A:完全正確,但我最擔(dān)心的是交貨時間。
    B:You may rest assured thatshipment will be effected within the time limit stipulatad in the contract. Butthere is also one point I’d like to stress.
    B:你可以放心,貨物會在合同中規(guī)定的時間內(nèi)裝運(yùn)。但我方也有一點(diǎn)想強(qiáng)調(diào)。
    A: Yes?
    A:什么?
    B: Your UC must be opened at least onemonth before the time shipment: otherwise we won't be able to catch the ship.
    B:你方信用證必須在裝運(yùn)前1個月開出,否則我們將趕不上船。
    A: No problem. I’ll have the covering UCopened as soon as I getback. In addition. would you tell me by whom thecommodity inspection is conducted before shipment?
    A:沒問題,我一回去,就馬上安排開立有關(guān)信用證。此外,您能告訴我們在裝船前這些商品是由誰負(fù)責(zé)檢驗(yàn)么?
    B: The goods will be inspected by the ChinaImport & Export Commodity Inspection Bureau. It will then issue acertificate of quality and a certificate of weight. These will be taken asfinal and biding.
    B: 貨物由中國進(jìn)出口商品檢驗(yàn)局檢驗(yàn),然后出具質(zhì)量和重量證書。這些證明書將是最后的依據(jù)并具有約束力。
    A: Please remember to use both English andChinese versions and both versions should be equally valid.
    A:請記住用中英兩種文字結(jié)合,兩種文本同樣有效。
    B: Naturally. Each of us keeps one oraginaland two copies.
    B:那當(dāng)然。雙方各保留一份原件和兩份復(fù)印件。
    A: Then I’ll come along three days later toput my signature on it.
    A:那么,三天后我來簽字。
    B: Good.
    B:好的