摘要:垃圾的衛(wèi)生填埋設(shè)計(jì)和運(yùn)行管理的難點(diǎn)是滲瀝液的處理。垃圾滲瀝液成份復(fù)雜,且水質(zhì)水量變化范圍大,這些特點(diǎn)給滲瀝液處理廠的設(shè)計(jì)及運(yùn)行管理帶來極大的困難。采用修筑環(huán)場(chǎng)截洪溝、分區(qū)設(shè)置清污分流排水系統(tǒng)、截洪與分區(qū)分流系統(tǒng)并用等措施,取得了良好效果。
關(guān)鍵詞:垃圾 填埋 滲瀝液 排水系統(tǒng)
A Study on the Setting of Drainage System for Garbage Backfilling
Abstract:Disposal of percolate is a difficulty in the designing and operational management of garbage sanitary backfilling.The composition of garbage percolate is complicated and the quality and quantity of the percolate vary greatly.These features bring about huge difficulties to the designing and operational management of percolate disposal facilities.Good results were obtained by building a floodwater catching channel around a garbage dumping ground setting a zoned separate sewage system and by the combined use of the floodwater catching system and the separate sewage system.
Key words:garbage;backfilling;percolate;sewage system
概述
垃圾的衛(wèi)生填埋是目前我國(guó)城市垃圾集中處置的主要方式,垃圾填埋場(chǎng)的設(shè)計(jì)和運(yùn)行管理中最令人頭痛的問題是垃圾滲瀝液的處理。由于垃圾滲瀝液水質(zhì)成份極復(fù)雜,且水質(zhì)水量受填埋場(chǎng)使用年限以及垃圾成份的變化、氣候等多種難以人為控制的因素影響而在很大的幅度范圍內(nèi)變化,這給滲瀝液處理的工藝選擇、設(shè)計(jì)參數(shù)的確定及運(yùn)行管理帶來極大的困難。滲瀝液水質(zhì)水量變化的另一特點(diǎn)是,當(dāng)填埋場(chǎng)流出的滲瀝液量大時(shí),其水中所含污染物濃度也隨之增加,往往使處理廠承受的負(fù)荷幾十倍地增加。因此,如何盡量減少填埋場(chǎng)排出的滲瀝液量是一個(gè)值得探討的問題。
填埋場(chǎng)排出的垃圾滲瀝量主要由垃圾中所含的水量、填埋場(chǎng)內(nèi)的地下涌出水和降雨所組成,根據(jù)廣州環(huán)衛(wèi)研究所的試驗(yàn)和幾個(gè)填埋場(chǎng)的設(shè)計(jì)及運(yùn)行管理的實(shí)踐,垃圾自身所含水量在總滲出量中所占比例極小,一般情況下,地下涌出水可在建場(chǎng)時(shí)采取工程措施給予控制,故滲瀝液量的主要來源及引起大幅度波動(dòng)的因素是降雨。降雨幾乎不能人為控制,因而只能在填埋場(chǎng)的設(shè)計(jì)中,通過采取與填埋場(chǎng)區(qū)的地形地貌和地質(zhì)條件及填埋場(chǎng)運(yùn)作方式相適應(yīng)的排水措施,盡量減少進(jìn)入填埋區(qū)的降雨量,從而減少污染物質(zhì)的排出量及水質(zhì)水量的波動(dòng)幅度。
下面結(jié)合工程設(shè)計(jì)和填埋場(chǎng)的運(yùn)行管理實(shí)踐對(duì)幾種排水系統(tǒng)及其適用性進(jìn)行探討。
1 環(huán)場(chǎng)截洪溝系統(tǒng)
排水系統(tǒng)一般是根據(jù)地形環(huán)繞填埋場(chǎng)修筑一條或不同高程的數(shù)條截洪溝,分別攔截各截洪溝外圍匯水區(qū)域內(nèi)的降雨。當(dāng)填埋區(qū)擴(kuò)展到某高程截洪溝時(shí),就將該截洪溝排放場(chǎng)外的通道截?cái)?,而將其與場(chǎng)內(nèi)為導(dǎo)出滲瀝液而設(shè)置的導(dǎo)滲溝連通,變?cè)摋l截洪溝為導(dǎo)滲溝。其中溝頂面高程等于最終覆蓋面的那部分截洪溝可改為最終覆蓋面表面排水溝加以利用。當(dāng)填埋場(chǎng)是利用較大的山谷或廢棄的山塘水庫(kù),且其填埋區(qū)以外匯水面積較大時(shí),如圖1,可采用環(huán)場(chǎng)截洪溝系統(tǒng),以盡量減少進(jìn)入填埋場(chǎng)的降雨量,達(dá)到減小滲瀝液量的目的。這種系統(tǒng)的優(yōu)點(diǎn)是運(yùn)轉(zhuǎn)可靠,管理簡(jiǎn)單,但在地形較為復(fù)雜,山脊山谷較多的地形條件下,截洪溝的長(zhǎng)度較長(zhǎng),建筑費(fèi)也會(huì)較高。值得提出的是,截洪溝的修筑不適宜采用機(jī)械開挖施工,而應(yīng)采用人工開挖,以盡量減少對(duì)原自然植被的破壞,否則有可能造成以后水土大量流失,給管理帶來極大麻煩,甚至危及截洪溝和填埋場(chǎng)其它設(shè)施的安全。廣州市李坑填埋場(chǎng)就有過類似的教訓(xùn)。
關(guān)鍵詞:垃圾 填埋 滲瀝液 排水系統(tǒng)
A Study on the Setting of Drainage System for Garbage Backfilling
Abstract:Disposal of percolate is a difficulty in the designing and operational management of garbage sanitary backfilling.The composition of garbage percolate is complicated and the quality and quantity of the percolate vary greatly.These features bring about huge difficulties to the designing and operational management of percolate disposal facilities.Good results were obtained by building a floodwater catching channel around a garbage dumping ground setting a zoned separate sewage system and by the combined use of the floodwater catching system and the separate sewage system.
Key words:garbage;backfilling;percolate;sewage system
概述
垃圾的衛(wèi)生填埋是目前我國(guó)城市垃圾集中處置的主要方式,垃圾填埋場(chǎng)的設(shè)計(jì)和運(yùn)行管理中最令人頭痛的問題是垃圾滲瀝液的處理。由于垃圾滲瀝液水質(zhì)成份極復(fù)雜,且水質(zhì)水量受填埋場(chǎng)使用年限以及垃圾成份的變化、氣候等多種難以人為控制的因素影響而在很大的幅度范圍內(nèi)變化,這給滲瀝液處理的工藝選擇、設(shè)計(jì)參數(shù)的確定及運(yùn)行管理帶來極大的困難。滲瀝液水質(zhì)水量變化的另一特點(diǎn)是,當(dāng)填埋場(chǎng)流出的滲瀝液量大時(shí),其水中所含污染物濃度也隨之增加,往往使處理廠承受的負(fù)荷幾十倍地增加。因此,如何盡量減少填埋場(chǎng)排出的滲瀝液量是一個(gè)值得探討的問題。
填埋場(chǎng)排出的垃圾滲瀝量主要由垃圾中所含的水量、填埋場(chǎng)內(nèi)的地下涌出水和降雨所組成,根據(jù)廣州環(huán)衛(wèi)研究所的試驗(yàn)和幾個(gè)填埋場(chǎng)的設(shè)計(jì)及運(yùn)行管理的實(shí)踐,垃圾自身所含水量在總滲出量中所占比例極小,一般情況下,地下涌出水可在建場(chǎng)時(shí)采取工程措施給予控制,故滲瀝液量的主要來源及引起大幅度波動(dòng)的因素是降雨。降雨幾乎不能人為控制,因而只能在填埋場(chǎng)的設(shè)計(jì)中,通過采取與填埋場(chǎng)區(qū)的地形地貌和地質(zhì)條件及填埋場(chǎng)運(yùn)作方式相適應(yīng)的排水措施,盡量減少進(jìn)入填埋區(qū)的降雨量,從而減少污染物質(zhì)的排出量及水質(zhì)水量的波動(dòng)幅度。
下面結(jié)合工程設(shè)計(jì)和填埋場(chǎng)的運(yùn)行管理實(shí)踐對(duì)幾種排水系統(tǒng)及其適用性進(jìn)行探討。
1 環(huán)場(chǎng)截洪溝系統(tǒng)
排水系統(tǒng)一般是根據(jù)地形環(huán)繞填埋場(chǎng)修筑一條或不同高程的數(shù)條截洪溝,分別攔截各截洪溝外圍匯水區(qū)域內(nèi)的降雨。當(dāng)填埋區(qū)擴(kuò)展到某高程截洪溝時(shí),就將該截洪溝排放場(chǎng)外的通道截?cái)?,而將其與場(chǎng)內(nèi)為導(dǎo)出滲瀝液而設(shè)置的導(dǎo)滲溝連通,變?cè)摋l截洪溝為導(dǎo)滲溝。其中溝頂面高程等于最終覆蓋面的那部分截洪溝可改為最終覆蓋面表面排水溝加以利用。當(dāng)填埋場(chǎng)是利用較大的山谷或廢棄的山塘水庫(kù),且其填埋區(qū)以外匯水面積較大時(shí),如圖1,可采用環(huán)場(chǎng)截洪溝系統(tǒng),以盡量減少進(jìn)入填埋場(chǎng)的降雨量,達(dá)到減小滲瀝液量的目的。這種系統(tǒng)的優(yōu)點(diǎn)是運(yùn)轉(zhuǎn)可靠,管理簡(jiǎn)單,但在地形較為復(fù)雜,山脊山谷較多的地形條件下,截洪溝的長(zhǎng)度較長(zhǎng),建筑費(fèi)也會(huì)較高。值得提出的是,截洪溝的修筑不適宜采用機(jī)械開挖施工,而應(yīng)采用人工開挖,以盡量減少對(duì)原自然植被的破壞,否則有可能造成以后水土大量流失,給管理帶來極大麻煩,甚至危及截洪溝和填埋場(chǎng)其它設(shè)施的安全。廣州市李坑填埋場(chǎng)就有過類似的教訓(xùn)。